This site is from a past semester! The current version will be here when the new semester starts.
TIC4001 2020
  • Full Timeline
  • Week 1 [Mon, Aug 10th]
  • Week 2 [Fri, Aug 14th]
  • Week 3 [Fri, Aug 21st]
  • Week 4 [Fri, Aug 28th]
  • Week 5 [Fri, Sep 4th]
  • Week 6 [Fri, Sep 11th]
  • Week 7 [Fri, Sep 18th]
  • Week 8 [Fri, Oct 2nd]
  • Week 9 [Fri, Oct 9th]
  • Week 10 [Fri, Oct 16th]
  • Week 11 [Fri, Oct 23rd]
  • Week 12 [Fri, Oct 30th]
  • Week 13 [Fri, Nov 6th]
  • Textbook
  • Admin Info
  • Report Bugs
  • Forum
  • Gitter (Chat)
  • Instructors
  • Announcements
  • Files
  • Java Coding Standard
  • Git Conventions
  • Participation Dashboard

  •  Individual Project (iP):
  • Individual Project Info
  • iP List
  • iP Upstream Repo
  • iP Code Dashboard
  • iP Progress Dashboard

  •  Team Project (tP):
  • Team Project Info
  • Team List
  • tP Code Dashboard
  • tP Progress Dashboard
  • Integration

    Introduction

    : Can explain integration

    Combining parts of a software product to form a whole is called integration. It is also one of the most troublesome tasks and it rarely goes smoothly.

    Build Automation

    Can explain build automation tools

    Build automation tools automate the steps of the build process, usually by means of build scripts.

    In a non-trivial project, building a product from its source code can be a complex multi-step process. For example, it can include steps such as: pull code from the revision control system, compile, link, run automated tests, automatically update release documents (e.g. build number), package into a distributable, push to repo, deploy to a server, delete temporary files created during building/testing, email developers of the new build, and so on. Furthermore, this build process can be done ‘on demand’, it can be scheduled (e.g. every day at midnight) or it can be triggered by various events (e.g. triggered by a code push to the revision control system).

    Some of these build steps such as compiling, linking and packaging, are already automated in most modern IDEs. For example, several steps happen automatically when the ‘build’ button of the IDE is clicked. Some IDEs even allow customization of this build process to some extent.

    However, most big projects use specialized build tools to automate complex build processes.

    Some popular build tools relevant to Java developers: Gradle, Maven, Apache Ant, GNU Make

    Some other build tools: Grunt (JavaScript), Rake (Ruby)

    Some build tools also serve as dependency management tools. Modern software projects often depend on third party libraries that evolve constantly. That means developers need to download the correct version of the required libraries and update them regularly. Therefore, dependency management is an important part of build automation. Dependency management tools can automate that aspect of a project.

    Maven and Gradle, in addition to managing the build process, can play the role of dependency management tools too.

    Gradle is used for,

    • a. better revision control
    • b. build automation
    • c. UML diagramming
    • d. project collaboration

    (b)

    Can explain continuous integration and continuous deployment

    An extreme application of build automation is called continuous integration (CI) in which integration, building, and testing happens automatically after each code change.

    A natural extension of CI is Continuous Deployment (CD) where the changes are not only integrated continuously, but also deployed to end-users at the same time.

    Some examples of CI/CD tools: Travis, Jenkins, Appveyor, CircleCI, GitHub Actions